Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/02/2011 Payment 0.00 0.00 0.00 0.00 0.00 0.00 5,367.50 5,367.50
2 11/08/2011 Payment 0.00 0.00 0.00 0.00 27,985.86 0.00 0.00 27,985.86
3 12/13/2011 Payment 0.00 0.00 0.00 0.00 0.00 0.00 10,933.74 10,933.74
4 08/03/2012 Payment 0.00 0.00 0.00 0.00 0.00 0.00 2,330.90 2,330.90
5 09/04/2012 Audit 0.00 0.00 0.00 0.00 -27,985.86 0.00 31,741.86 3,756.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 50,374.00 50,374.00