Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 05/08/2012 Payment 0.00 0.00 7,455.51 0.00 0.00 0.00 0.00 7,455.51
2 06/08/2012 Payment 0.00 0.00 952.02 0.00 0.00 0.00 0.00 952.02
3 11/13/2012 Audit 0.00 0.00 842.47 0.00 10,472.00 0.00 65,953.00 77,267.47
TOTAL PAYMENTS 0.00 0.00 9,250.00 0.00 10,472.00 0.00 65,953.00 85,675.00