Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/17/2023 Payment 0.00 0.00 4,338.07 0.00 0.00 0.00 0.00 4,338.07
2 08/21/2023 Payment 0.00 0.00 3,986.49 0.00 0.00 0.00 0.00 3,986.49
3 11/02/2023 Payment 0.00 0.00 2,890.07 0.00 0.00 0.00 0.00 2,890.07
4 11/14/2024 Audit 0.00 0.00 1,990.37 0.00 7,160.00 0.00 205,876.00 215,026.37
TOTAL PAYMENTS 0.00 0.00 13,205.00 0.00 7,160.00 0.00 205,876.00 226,241.00