Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/18/2023 Payment 0.00 0.00 36,080.94 0.00 0.00 0.00 0.00 36,080.94
2 09/11/2023 Payment 0.00 0.00 0.00 0.00 0.00 0.00 255,767.08 255,767.08
3 09/25/2023 Payment 0.00 0.00 26,615.93 0.00 0.00 0.00 295,010.15 321,626.08
4 11/29/2023 Audit 0.00 0.00 -26,312.87 0.00 31,527.00 0.00 28,988.77 34,202.90
TOTAL PAYMENTS 0.00 0.00 36,384.00 0.00 31,527.00 0.00 579,766.00 647,677.00