Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/07/2016 Payment 0.00 0.00 0.00 0.00 0.00 0.00 1,765.47 1,765.47
2 10/17/2018 Payment 0.00 0.00 0.00 0.00 0.00 0.00 20,085.36 20,085.36
3 11/07/2018 Payment 0.00 0.00 0.00 0.00 0.00 0.00 56,598.48 56,598.48
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 78,449.31 78,449.31