Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/07/2013 Payment 0.00 0.00 0.00 0.00 0.00 0.00 3,279.89 3,279.89
2 07/23/2014 Payment 0.00 0.00 0.00 0.00 0.00 0.00 1,723.18 1,723.18
3 10/17/2014 Payment 0.00 0.00 0.00 0.00 0.00 0.00 1,378.32 1,378.32
4 03/02/2015 Audit 0.00 0.00 0.00 0.00 91.39 0.00 199.22 290.61
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 91.39 0.00 6,580.61 6,672.00