Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/27/2021 Payment 0.00 0.00 0.00 0.00 0.00 0.00 35,882.85 35,882.85
2 11/15/2021 Payment 0.00 0.00 0.00 0.00 0.00 0.00 6,370.82 6,370.82
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 42,253.67 42,253.67