Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/27/2023 Payment 0.00 0.00 8,550.00 0.00 0.00 0.00 0.00 8,550.00
2 10/07/2024 Payment 0.00 0.00 34,199.95 0.00 28,754.48 570.68 338,011.62 401,536.73
3 01/29/2025 Audit 0.00 0.00 0.00 0.00 14,376.42 -570.68 4,776.53 18,582.27
TOTAL PAYMENTS 0.00 0.00 42,749.95 0.00 43,130.90 0.00 342,788.15 428,669.00