Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 03/01/2021 Audit 0.00 0.00 14,110.13 0.00 12,189.69 0.00 106,703.18 133,003.00
TOTAL PAYMENTS 0.00 0.00 14,110.13 0.00 12,189.69 0.00 106,703.18 133,003.00