Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/09/2017 Payment 0.00 0.00 40,045.29 0.00 0.00 0.00 0.00 40,045.29
2 11/30/2017 Audit 0.00 0.00 -6,256.35 0.00 30,275.16 0.00 270,176.90 294,195.71
TOTAL PAYMENTS 0.00 0.00 33,788.94 0.00 30,275.16 0.00 270,176.90 334,241.00