Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/30/2013 Payment 0.00 0.00 0.00 0.00 68,266.67 0.00 290,843.62 359,110.29
2 12/04/2013 Payment 0.00 0.00 0.00 0.00 0.00 0.00 15,307.56 15,307.56
3 01/14/2014 Payment 0.00 0.00 0.00 0.00 8,286.71 0.00 0.00 8,286.71
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 76,553.38 0.00 306,151.18 382,704.56