Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/14/2009 Audit 0.00 0.00 0.00 0.00 0.00 0.00 282,648.53 282,648.53
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 282,648.53 282,648.53