Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/15/2024 Payment 0.00 0.00 18,083.33 0.00 0.00 0.00 0.00 18,083.33
2 10/22/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 207,733.60 207,733.60
3 12/02/2024 Audit 0.00 0.00 918.67 0.00 16,700.00 278.00 0.40 17,897.07
TOTAL PAYMENTS 0.00 0.00 19,002.00 0.00 16,700.00 278.00 207,734.00 243,714.00