Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/20/2021 Payment 0.00 0.00 0.00 0.00 0.00 5,133.71 0.00 5,133.71
2 12/01/2021 Payment 0.00 0.00 0.00 0.00 0.00 7,905.00 17,916.09 25,821.09
3 12/23/2021 Payment 0.00 0.00 0.00 0.00 0.00 4,436.00 0.00 4,436.00
4 04/12/2022 Audit 0.00 0.00 0.00 0.00 0.00 13,480.29 -17,916.09 -4,435.80
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 30,955.00 0.00 30,955.00