Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/08/2019 Payment 0.00 0.00 3,807.29 0.00 0.00 0.00 0.00 3,807.29
2 11/13/2019 Payment 0.00 0.00 0.00 0.00 0.00 0.00 35,400.54 35,400.54
3 11/27/2019 Payment 0.00 0.00 4,328.65 0.00 0.00 0.00 0.00 4,328.65
4 07/15/2020 Payment 0.00 0.00 0.00 0.00 0.00 0.00 36,623.33 36,623.33
5 12/01/2020 Audit 0.00 0.00 -3,966.81 0.00 5,824.62 0.00 -0.62 1,857.19
TOTAL PAYMENTS 0.00 0.00 4,169.13 0.00 5,824.62 0.00 72,023.25 82,017.00