Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/20/2018 Payment 0.00 0.00 6,750.26 0.00 0.00 0.00 0.00 6,750.26
2 11/15/2018 Payment 0.00 0.00 0.00 0.00 8,649.74 0.00 158,604.85 167,254.59
3 05/01/2019 Audit 0.00 0.00 486.42 0.00 -485.75 0.00 11,549.48 11,550.15
TOTAL PAYMENTS 0.00 0.00 7,236.68 0.00 8,163.99 0.00 170,154.33 185,555.00