Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/17/2024 Payment 0.00 0.00 13,882.15 0.00 0.00 0.00 0.00 13,882.15
2 10/31/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 452,552.03 452,552.03
3 12/02/2024 Audit 0.00 0.00 148.85 0.00 16,700.00 239.00 -0.03 17,087.82
TOTAL PAYMENTS 0.00 0.00 14,031.00 0.00 16,700.00 239.00 452,552.00 483,522.00