Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 06/01/2008 Payment 0.00 0.00 0.00 0.00 0.00 859.79 0.00 859.79
2 11/07/2008 Audit 0.00 0.00 0.00 0.00 0.00 -859.79 11,838.00 10,978.21
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 11,838.00 11,838.00