Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 04/21/2011 Payment 0.00 0.00 10,096.90 0.00 0.00 0.00 0.00 10,096.90
2 06/14/2011 Payment 0.00 0.00 3,163.27 0.00 0.00 0.00 0.00 3,163.27
3 09/09/2011 Audit 0.00 0.00 0.00 0.00 5,593.44 7,856.98 68,135.41 81,585.83
4 09/28/2011 Audit 0.00 0.00 2.98 0.00 976.57 -0.04 -0.51 979.00
TOTAL PAYMENTS 0.00 0.00 13,263.15 0.00 6,570.01 7,856.94 68,134.90 95,825.00