Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/02/2009 Audit 0.00 0.00 0.00 0.00 0.00 0.00 142,532.00 142,532.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 142,532.00 142,532.00