Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/09/2024 Payment 0.00 0.00 4,996.77 0.00 0.00 0.00 0.00 4,996.77
2 11/25/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 171,869.48 171,869.48
3 12/30/2024 Audit 0.00 0.00 0.23 0.00 1,318.00 0.00 37,373.52 38,691.75
TOTAL PAYMENTS 0.00 0.00 4,997.00 0.00 1,318.00 0.00 209,243.00 215,558.00