Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/29/2009 Payment 0.00 0.00 0.00 0.00 0.00 0.00 59,052.00 59,052.00
2 01/05/2010 Audit 0.00 0.00 0.00 0.00 0.00 0.00 3,108.00 3,108.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 62,160.00 62,160.00