Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 01/03/2023 Audit 0.00 0.00 0.00 0.00 0.00 0.00 145,323.00 145,323.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 145,323.00 145,323.00