Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 05/22/2014 Payment 0.00 0.00 0.00 0.00 5,289.39 0.00 0.00 5,289.39
2 06/17/2014 Payment 0.00 0.00 0.00 0.00 0.00 0.00 95,768.23 95,768.23
3 07/15/2014 Audit 0.00 0.00 4,995.06 0.00 4,107.62 0.00 -8,795.30 307.38
TOTAL PAYMENTS 0.00 0.00 4,995.06 0.00 9,397.01 0.00 86,972.93 101,365.00