Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/07/2006 Audit 0.00 0.00 0.00 0.00 6,176.00 8,046.00 26,262.00 40,484.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 6,176.00 8,046.00 26,262.00 40,484.00