Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/19/2016 Payment 0.00 0.00 14,858.91 0.00 9,863.96 0.00 138,680.13 163,403.00
2 02/15/2017 Audit 0.00 0.00 -384.67 0.00 5,590.49 0.00 7,299.18 12,505.00
TOTAL PAYMENTS 0.00 0.00 14,474.24 0.00 15,454.45 0.00 145,979.31 175,908.00