Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/30/2008 Payment 0.00 0.00 0.00 0.00 0.00 0.00 9,181.66 9,181.66
2 09/01/2008 Payment 0.00 0.00 0.00 0.00 0.00 0.00 45,530.91 45,530.91
3 02/20/2009 Audit 0.00 0.00 0.00 0.00 0.00 0.00 10,705.29 10,705.29
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 65,417.86 65,417.86