Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/09/2006 Payment 0.00 0.00 0.00 0.00 0.00 0.00 30,241.20 30,241.20
2 12/19/2006 Audit 0.00 0.00 520.00 0.00 0.00 3,727.00 -0.20 4,246.80
TOTAL PAYMENTS 0.00 0.00 520.00 0.00 0.00 3,727.00 30,241.00 34,488.00