Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/03/2024 Payment 0.00 0.00 10,705.00 0.00 9,634.50 0.00 143,398.70 163,738.20
2 04/14/2025 Audit 0.00 0.00 0.00 0.00 1,070.50 0.00 7,547.30 8,617.80
TOTAL PAYMENTS 0.00 0.00 10,705.00 0.00 10,705.00 0.00 150,946.00 172,356.00