Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 05/09/2018 Payment 0.00 0.00 0.00 0.00 224.80 0.00 0.00 224.80
2 06/14/2018 Payment 0.00 0.00 0.00 0.00 1,186.86 0.00 38,174.22 39,361.08
3 07/13/2018 Payment 0.00 0.00 0.00 0.00 2,081.74 0.00 0.00 2,081.74
4 08/09/2018 Payment 0.00 0.00 0.00 0.00 1,965.10 0.00 707.81 2,672.91
5 10/30/2018 Audit 0.00 0.00 0.00 0.00 -1,618.53 0.00 0.00 -1,618.53
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 3,839.97 0.00 38,882.03 42,722.00