BRIDGE END to N EVERETT ST | 0.62 | ACP | 05/22/2023 | 90 |
C AVE to E AVE | 0.09 | ACP | 05/22/2023 | 81 |
E AVE to PAVEMENT CHANGE | 0.08 | ACP | 05/22/2023 | 81 |
NORTH SUPERIOR to C AVE | 0.32 | ACP | 05/22/2023 | 90 |
PAVEMENT CHANGE to N DILLARD AVE | 0.11 | Concrete | 05/22/2023 | 95 |
W EOR to NORTH SUPERIOR | 0.32 | ACP | 05/22/2023 | 90 |