BRIDGE END to N EVERETT ST 0.62 ACP 05/22/2023 90
C AVE to E AVE 0.09 ACP 05/22/2023 81
E AVE to PAVEMENT CHANGE 0.08 ACP 05/22/2023 81
NORTH SUPERIOR to C AVE 0.32 ACP 05/22/2023 90
PAVEMENT CHANGE to N DILLARD AVE 0.11 Concrete 05/22/2023 95
W EOR to NORTH SUPERIOR 0.32 ACP 05/22/2023 90