City of Longview
Nichols Boulevard
Ocean Beach Hwy(SR 4) to Louisiana St
TIB Award Amount
$1,566,400
Region: Southwest   |   Legislative District: 19   |   Length: 0.60 mi. FY 2025 Urban Arterial Program (UAP)

Existing Conditions

This section fronts on Lake Sacajawea and see a lot of foot traffic to and from the park. Pavement condition is poor, ADA ramps need to be replaced and brought up to standards, the intersection of NW and NE Nichols is at an acute angle with multiple points of entry, and there are no existing bike lanes.

Project Funding

  TIB Funds Local Funds Total Costs
Design 204,800 51,200 256,000
Right of Way 0 0 0
Construction 1,361,600 340,400 1,702,000
Project Totals $1,566,400 $391,600 $1,958,000

Local Match

TIB Participation Local Match Minimum Local Match
80.0% 20.0% 20%

Description of Improvements

Grind and inlay with HMA. Replace broken concrete street panels, as needed. Replace and upgrade ADA ramps. Realign the NW and NE Nichols intersection using curbs and striping to eliminate intersection conflict points. Add bike lanes.