City of Wenatchee
9th Street Corridor Improvements
Miller St to BNSF Railroad Crossing
TIB Award Amount
$1,199,000
Region: Northeast   |   Legislative District: 12   |   Length: 0.35 mi. FY 2025 Urban Arterial Program (UAP)

Existing Conditions

9th Street is a minor arterial supporting freight connections. The street has four lanes and there are no exclusive left-turn lanes in the corridor. From 1/1/2020 to 12/31/2022 there were 69 crashes, 66 took place at intersections and 21 were injury crashes. The route is prioritized in the 2022 Wenatchee Valley Bicycle Master Plan and destinations identified in the 2018 Human Services Transportation Plan.

Project Funding

  TIB Funds Local Funds Total Costs
Design 141,792 35,498 177,290
Right of Way 17,403 4,357 21,760
Construction 1,039,805 260,315 1,300,120
Project Totals $1,199,000 $300,170 $1,499,170

Local Match

TIB Participation Local Match Minimum Local Match
80.0% 20.0% 20%

Description of Improvements

Reconfigure from four to three traffic lane conversion, bike lanes and signal modifications.