Region: Northeast | Legislative District: 12 | Length: 0.12 mi. | FY 2025 Urban Arterial Program (UAP) |
![]() |
Existing ConditionsThe Sunnyslope area is a rapidly growing urban area adjacent to the northern city limits of Wenatchee. Traffic on this route includes residential, school bus, truck traffic. The existing intersection experiences high crash frequencies and congestion during peak hours (LOS E, 2015 traffic analysis). |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 122,224 | 249,217 | 371,441 |
Right of Way | 32,905 | 67,095 | 100,000 |
Construction | 644,871 | 1,314,905 | 1,959,776 |
Project Totals | $800,000 | $1,631,217 | $2,431,217 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
32.9% | 67.1% | 15% |
Construct roundabout including illumination, ADA compliant ramps, new enhanced school crossing, and shared-use path within the project area.