Region: Southwest | Legislative District: 19 | Length: 0.50 mi. | FY 2025 Urban Arterial Program (UAP) |
![]() |
Existing ConditionsThis section fronts on Northlake Elementary school and see a lot of foot traffic to and from the school. Pavement condition is poor, ADA ramps need to be replaced and brought up to standards signal needs to be replaced with appropriate pedestrian upgrades. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 136,000 | 34,000 | 170,000 |
Right of Way | 0 | 0 | 0 |
Construction | 904,000 | 226,000 | 1,130,000 |
Project Totals | $1,040,000 | $260,000 | $1,300,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
80.0% | 20.0% | 20% |
Grind and inlay with HMA after replacing broken concrete panels to restore pavement condition. replace ADA ramps. replace and/or upgrade signal system.