City of Kalama
Cedar Street and S 10th Street Sidewalk
Near 8th St to 10th St and Cedar St to 225 ft south
TIB Award Amount
$360,009
Region: West   |   Legislative District: 20   |   Length: 590.00 ft. FY 2023 Small City Sidewalk Program (SCSP)

Existing Conditions

The existing sidewalk on the north side of Cedar Street ends at the eastern limits of the Kalama School District ballfields, and the existing sidewalk on South 10th Street ends mid-block between Birch Street and Cedar Street. This is a gap in the sidewalk network.

Project Funding

  TIB Funds Local Funds Total Costs
Design 41,540 4,615 46,155
Right of Way 0 0 0
Construction 318,470 35,385 353,855
Project Totals $360,009 $40,001 $400,010

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 5%

Description of Improvements

Extending the existing sidewalk on Cedar Street east to South 10th Street, and extending the existing sidewalk on South 10th Street north to Cedar Street will fill a gap in the City sidewalk system, providing residents with a safe and accessible route to the Kalama School District ballfields, elementary, middle, and high schools.