City of Moxee
Iler Street Resurfacing
Park Street to Rainer Avenue
TIB Award Amount
$387,380
Region: East   |   Legislative District: 13   |   Length: 0.00 mi. FY 2026 Small City Preservation Program (SCPP)

Existing Conditions

Anticipated Project Costs

  TIB Funds Local Funds Total Costs
Design 41,715 4,635 46,350
Right of Way 0 0 0
Construction 345,665 38,405 384,070
Project Totals $387,380 $43,040 $430,420

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 10%

Description of Improvements

Grind and overlay the travel lanes with 2" HMA.