|
|
||||
Region: East | Legislative District: 13 | Length: 0.00 mi. | FY 2026 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 41,715 | 4,635 | 46,350 |
Right of Way | 0 | 0 | 0 |
Construction | 345,665 | 38,405 | 384,070 |
Project Totals | $387,380 | $43,040 | $430,420 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Grind and overlay the travel lanes with 2" HMA.