|
|
||||
Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2026 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 21,901 | 1,152 | 23,053 |
Right of Way | 0 | 0 | 0 |
Construction | 459,916 | 24,206 | 484,122 |
Project Totals | $481,815 | $25,360 | $507,175 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Chip or Otta Seal.