|
|
||||
Region: West | Legislative District: 24 | Length: 0.00 mi. | FY 2025 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 340,000 | 22,400 | 362,400 |
Project Totals | $340,000 | $22,400 | $362,400 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
93.8% | 6.2% | 5% |
2 inch grind and overlay