|
|
||||
Region: West | Legislative District: 20 | Length: 0.00 mi. | FY 2025 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 20,900 | 1,100 | 22,000 |
Right of Way | 0 | 0 | 0 |
Construction | 162,609 | 8,559 | 171,168 |
Project Totals | $183,509 | $9,659 | $193,168 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
1 inch overlay