Region: Puget Sound | Legislative District: 48 | Length: 0.00 mi. | FY 2025 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 13,437 | 1,493 | 14,930 |
Right of Way | 0 | 0 | 0 |
Construction | 125,307 | 13,923 | 139,230 |
Project Totals | $138,744 | $15,416 | $154,160 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Grind and 2-inch overlay with spot pavement repairs of the following segments: NE 26th Street - 82nd Ave NE to E EOR 77th Place NE - NE 16th St to S EOR with 2 ADA ramps