Region: West | Legislative District: 14 | Length: 0.00 mi. | FY 2024 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 144,907 | 7,627 | 152,534 |
Project Totals | $144,907 | $7,627 | $152,534 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Chip Seal of the following segments: Frank John Road - Loop Rd to C/L Gale Street - Frank John Rd to End Hemingway Street - Lutheran Church Rd to Lower Basso Cir Vista Drive - Loop Rd to Rnd Montell Terrace - Loop Rd to End Jordan Road - Frank John Rd to End Ridgecrest Drive - W End to E End Lutheran Church Road - SR 14 to End Lower Basso Circle - Lutheran Church Rd to End Wisteria Way - Bone Rd to End Lucas Street - Loop Rd to End Thomas Street - Frank John Rd to Loop Rd