Region: East | Legislative District: 12 | Length: 0.00 mi. | FY 2024 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 43,279 | 4,808 | 48,087 |
Right of Way | 0 | 0 | 0 |
Construction | 331,831 | 36,867 | 368,698 |
Project Totals | $375,109 | $41,676 | $416,785 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 0% |
Pavement Repair and Overlay of the following segments: 5th Avenue - Glover St to Bridge St Lincoln Street - 5th Ave to 3rd Ave 4th Avenue - Glover St to Lincoln St