Region: Puget Sound | Legislative District: 2 | Length: 0.00 mi. | FY 2024 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 53,200 | 2,800 | 56,000 |
Right of Way | 0 | 0 | 0 |
Construction | 236,299 | 12,437 | 248,736 |
Project Totals | $289,499 | $15,237 | $304,736 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
This project grinds, patches and provide a 2-inch overlay of Center Street E between Weyerhaeuser Way and the East C/L and upgrade 2 ADA ramps