Region: West | Legislative District: 10 | Length: 0.00 mi. | FY 2024 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 11,523 | 606 | 12,129 |
Right of Way | 0 | 0 | 0 |
Construction | 265,033 | 13,949 | 278,982 |
Project Totals | $276,556 | $14,555 | $291,111 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
1.5 inch HMA overlays of the following segments: Leisure Loop - Entire Loop - Jackson St to Jackson St Pennington Loop - w/o Summit Lp to e/o Summit Lp Summit Loop - Pennington Lp to Pennington Lp Center Street - NE 9th St to NE Front St Haller Street - NE 4th St to NE 6th St Broadway Street - NW Madrona Wy to NW Coveland St