City of Montesano
E Pioneer Avenue Overlay
Academy St to Glenn St
TIB Award Amount
$110,000
Region: West   |   Legislative District: 19   |   Length: 0.00 mi. FY 2023 Small City Preservation Program (SCPP)

Existing Conditions

Anticipated Project Costs

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 110,000 30,000 140,000
Project Totals $110,000 $30,000 $140,000

Local Match

TIB Participation Local Match Minimum Local Match
78.6% 21.4% 5%

Description of Improvements

Grind/Mill old existing pavement to 1-inch depth, to 1 from edge of existing pavement. Install overlay with 2-inch depth at centerline crown out to match 1-inch depth at edge to match existing. Pre-level as needed prior to final HMA course. Stripe.