Region: West | Legislative District: 2 | Length: 0.00 mi. | FY 2021 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 18,340 | 1,254 | 19,594 |
Right of Way | 0 | 0 | 0 |
Construction | 140,613 | 9,612 | 150,225 |
Project Totals | $158,953 | $10,866 | $169,819 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
93.6% | 6.4% | 5% |
The work will include overlaying of Rainier Road from 505 Minnesota Street west to the City limits. This project, if funded, will include the dig out and subgrade repair of the areas showing severe alligator cracking. Traffic will be diverted around the project area using 133rd Ave SE to Centre Street as a bypass during construction. This will allow continuous traffic flow to the City and construction work to proceed uninterupted