Region: East | Legislative District: 6 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsExisting network has several pavement distresses throughout the city network. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 43,560 | 2,293 | 45,853 |
Project Totals | $43,560 | $2,293 | $45,853 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
City performed pavement repair and crack sealing.