Town of Odessa
2024 Maintenance Project
Multiple Locations
TIB Award Amount
$190,630
Region: East   |   Legislative District: 9   |   Length: 0.00 mi. FY 2025 Small City Maintenance Program (SCMP)

Existing Conditions

Pavement cracks and pavement degradation exists on many roadway areas in Town.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 190,630 0 190,630
Project Totals $190,630 $0 $190,630

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

Clean and install crack sealant and dig out and repair areas of pavement degradation that are not practical to crack seal or chip seal