City of Tieton
2024 Street Maintenance
Multiple Locations
TIB Award Amount
$65,906
Region: East   |   Legislative District: 13   |   Length: 0.00 mi. FY 2025 Small City Maintenance Program (SCMP)

Existing Conditions

To fill or repair minor or major cracks forming in the ageing asphalt of Tietons city streets.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 65,906 3,469 69,375
Project Totals $65,906 $3,469 $69,375

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

Hire a company or equipment capable of preforming or assisting in the process of sealing the cracks in the asphalt with a hot pour rubberized crack sealing compound.